<html>
<head>
<meta content="text/html; charset=ISO-8859-1"
http-equiv="Content-Type">
</head>
<body bgcolor="#FFFFFF" text="#330033">
<br>
<div class="moz-cite-prefix">On 25-Nov-14 14:42, Guru Acharya wrote:<br>
</div>
<blockquote
cite="mid:CAEEwkf7ZZNB4kotXzawzoFnTYMm9ez3CXQWcAnZN9XWXwFEm6A@mail.gmail.com"
type="cite">
<pre wrap="">1) That there is no need for an RFP in September 2015 when the current
contract term ends.</pre>
</blockquote>
<br>
Note, I also do not think that there is the need for an RFP in
2015. <br>
I do not think that would contribute to stability or quality of
performance.<br>
<br>
<blockquote
cite="mid:CAEEwkf7ZZNB4kotXzawzoFnTYMm9ez3CXQWcAnZN9XWXwFEm6A@mail.gmail.com"
type="cite">
<pre wrap="">
2) That there is no need for an RFP that is periodic.
</pre>
</blockquote>
<br>
While I do believe there is a need to a periodic one. <br>
I think the first can be 3-9 years hence. <br>
9 seems long, 3 might be short.<br>
6 might be in compromise range.<br>
<br>
avri<br>
</body>
</html>