[CWG-Stewardship] Service Level Expectations Design Team Template
Alan Greenberg
alan.greenberg at mcgill.ca
Sun Mar 1 23:15:58 UTC 2015
Yes David, of course!
If it was not clear, I meant changes that are not required by the
transition itself.
Alan
At 01/03/2015 06:00 PM, David Conrad wrote:
>Alan,
>
> > I do have a problem with requirement which would force internal
> changes within IANA at the same time as the transition is going on.
> That violates the rule of making as few changes as possible in parallel.
>
>Apologies for being repetitive, but just to be sure, one more time
>with emphasis:
>
>Internal changes at IANA _must_ occur with the transition because
>NTIA is integrated into IANA operations.
>
>The process and possibly the code by which root zone updates are
>made _must_ change. This _may_ impact the SLEs as specified in
>C.4.2 of the current IANA Function Contract and hence could impact
>the outcome of the Design Team.
>
>It may be appropriate to minimize the internal changes required
>within IANA during the transition, but there already exists a
>requirement for some change.
>
>Regards,
>-drc
>
>
More information about the CWG-Stewardship
mailing list