[arabic-vip] next call

Baher Esmat baher.esmat at icann.org
Wed Aug 3 09:46:11 UTC 2011


On 8/3/11 8:01 PM, "Sarmad Hussain" <sarmad.hussain at kics.edu.pk> wrote:

> 
> 
> 3.      There has been a request to review the meeting time and move it a few
> hours later.  Though we have had good and regular attendance in our calls by
> many, it is perhaps a good idea to review the current time (as we have already
> met on this for at least a month).  Baher is requested to circulate a doodle
> poll for current and one or two slots for a later time on Tuesdays (so as not
> to open things too much).  Unless, otherwise specified, we will continue to
> have our calls at the same time on Tuesdays. 

Doodle poll: http://www.doodle.com/3z6igurxd5xksune#table.
 
> 
> 4.      Baher is also requested to let us know if there is any group or public
> discussion on these documents during the Senegal meeting (similar to the
> meetings in Singapore)? Also, will these documents be put up for public
> comments?  If yes, are there any concrete plans for collective VIP project or
> should  Arabic script team discuss and suggest their own separate plans?

All case study teams should submit their draft final reports by 30
September. Reports will be posted for public comments for 30 days. For
Dakkar, the plan is to have team coordinators meet to discuss the project
issues report. The plan is to have the first draft of the project issues
report ready by mid November.

Hope this answers your questions.

Regards,
Baher 
> 
>  
> 
>  
>  
>  
> ----
> سرمد حسین 
>  
> Sarmad Hussain 
> Professor and Head
> Center for Language Engineering (www.cle.org.pk)
> Al-Khawarizmi Institute of Computer Science (www.kics.edu.pk)
> University of Engineering and Technology (www.uet.edu.pk)
> Lahore, PAKISTA
>  
>  
>  
> 




More information about the arabic-vip mailing list