[GNSO-RPM-WG] Notes and Action Items: RPM PDP WG Meeting 20 May 2020

Julie Hedlund julie.hedlund at icann.org
Wed May 20 19:34:08 UTC 2020


Dear All,

Please see below the action items captured by staff from the RPM PDP Working Group call held on 20 May 2020 at 17:00 UTC.  Staff will post these to the wiki space.  Please note that these are high-level notes and are not meant as a substitute for the recording, chat room, or transcript. The recording, Zoom chat, transcript and attendance records are posted on the wiki at: https://community.icann.org/display/RARPMRIAGPWG/2020-05-20+Review+of+all+Rights+Protection+Mechanisms+%28RPMs%29+in+all+gTLDs+PDP+WG.


Best Regards,
Julie
Julie Hedlund, Policy Director

==

NOTES & ACTION ITEMS

Actions:

Call for Volunteers for Sub Groups A (TMCH, Sunrise, TM Claims, TM-PDDRP) and B (URS):

ACTION ITEM 1: Staff will send a reminder. [COMPLETE]
ACTION ITEM 2: WG members should respond ASAP if they wish to join as a member and/or chair. [COMPLETE COB 21 May]
ACTION ITEM 3: Staff will suggest meeting times based on what works best for Sub Group members and are not conflicting with other meetings. [COMPETE COB 21 May]
ACTION ITEM 4: GNSO Secretariat will send invites for meetings on 26 May (Sub Group A) and 28 May (Sub Group B). [COMPLETE 22 May]

Notes:

1. Updates to Statements of Interest: No updates provided

2. Public Comment Review Tool:

-- 4 Spreadsheets with multiple tabs: URS, Non-URS (TMCH, Sunrise, TM Claims, TM-PDDRP), URS and TMCH Individual Proposals, Overarching Questions
-- Followed the same format as was used for SubPro.
-- See: https://www.icann.org/en/system/files/files/report-comments-rpm-initial-report-18may20-en.pdf
 and https://community.icann.org/display/RARPMRIAGPWG/
-- Example: TMCH Recommendation #1: https://docs.google.com/spreadsheets/d/1xMehg9o44bdz85ry0LJvhzoOaKdmJ6SwIrLneMx0Ixc/edit#gid=1163822586
-- Question: How did you determine the color scheme? Answer: The highlight color matches the section -- green for support, red for non support, etc.
-- Question: How did you determine what goes into the Comment Highlight table? Answer: This reflects themes that we have seen.  These are extractions or key points.

3. Review the Final Phase 1 Work Plan - RPMs PDP WG Detailed Plan 15 May 2020 DRAFT at: https://docs.google.com/spreadsheets/d/1PvkLsz4gQMXbkraeNq0iGjmwOJZsG9e7caNQVBEZxpU/edit?usp=sharing [docs.google.com]<https://urldefense.proofpoint.com/v2/url?u=https-3A__docs.google.com_spreadsheets_d_1PvkLsz4gQMXbkraeNq0iGjmwOJZsG9e7caNQVBEZxpU_edit-3Fusp-3Dsharing&d=DwMGaQ&c=FmY1u3PJp6wrcrwll3mSVzgfkbPSS6sJms7xcl4I5cM&r=adDIs0WEx_lLwFfrsdovxTYY8GkRHo5ibc8SR3Npdh8&m=ZMF8ufmNFaeVxot_vjRRoxWkJNpiNDZT8yylxa9FJco&s=DEyc7GmCq6KJbRSCjqn3x54wYfsDq3vcO8CoDgTgX2E&e=> (note that this is a tentative Work Plan and is subject to change)

-- Sub Group members should review the comments in the spreadsheet tab prior to the meeting.
-- Staff will include the link to the spreadsheet and indicate the tabs that will be addressed in the agenda for the upcoming meeting, to be sent at least 48-hours in advance.
-- The Sub Groups will review the comments and determine where there are high-level agreements; staff will assist in producing summary documents concurrently with the work.
-- Sub Groups will not determine recommendations, but will provide the summary to the full WG, which will then agree via consensus on the recommendations for the Final Report.
-- The full WG may concurrently review the URS and TMCH Individual Proposals and Overarching Questions, although this is still to be determined.

4. Call for Volunteers for Sub Group A (TMCH, Sunrise, TM Claims, and TM-PDDRP) and Sub Group B (URS)

-- Staff will send a reminder.
-- WG members are encouraged to respond ASAP so that meetings can be scheduled for 26 May (Sub Group A) and 28 May (Sub Group B).
-- Staff will work with the Sub Groups to find suitable meeting times, while recognizing that due to conflicts meeting slots will be limited.
-- As noted above, the Sub Groups will perform the work of analyzing the comments on the preliminary recommendations and providing a summary of high-level agreements (with staff support) to the WG to review; the full WG will determine the final recommendations.
-- There is no limit to the number of WG members who can join a Sub Group, but WG members should be expected to participate if they join.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mm.icann.org/pipermail/gnso-rpm-wg/attachments/20200520/ccca1ebf/attachment.html>


More information about the GNSO-RPM-WG mailing list