[ChineseGP] [Japanesegp] : [agenda] CJK+IP meeting at 9:00UTC on Thursday 10 March 2016
Yoshiro YONEYA
yoshiro.yoneya at jprs.co.jp
Thu Mar 10 10:40:27 UTC 2016
What is going on right now?
Only Wangwei and I are on the adobe connect room.
Can someone in Marrakech give current status?
Regards,
--
Yoshiro YONEYA <yoshiro.yoneya at jprs.co.jp>
On Thu, 10 Mar 2016 12:10:07 +0900 HiroHOTTA <hotta at jprs.co.jp> wrote:
> materials for discussion are attached to this mail
> ==================================================
>
> 10 Mar 2016
> Proposed by Hiro
>
> [agenda] CJK coordination meeting on 10 Mar 2016
>
> date/time
> March 10 2016
> <part1> with IP 09:00-10:15
> <part2> without IP 10:30-11:45
>
> place
> Amandier room
>
> remote participation (to be confirmed)
> https://icann.adobeconnect.com/lgr/
>
> participants (assumed to be)
> CGP on site : Chris Dillon
> remote : Wang Wei, Kenny Huang, Declan MA, Jiankang YAO
> JGP on site : Hiro Hotta, Yuri Takamatsu
> remote : Yoshiro Yoneya
> KGP on site : KIM Kyongsok, Eung-jun Jeon
> advisor : Edmon Chung
> IP on site : Michel Suignard, Marc Blanchet
> ICANN : Sarmad Hussain
>
> agenda
>
> <part1>
>
> 1. rationale of "the number of allocatable lables should be small"
>
> rationale is hoped to be described in writing
> - why small?
> - how small?
> - aspect of reduction
> + reduction of characters?
> + reduction of variant characters?
> + reduction of variant labels by WLE?
> + :
>
> 2. complement process for LGR
>
> what kind of process can be incorporated into the whole application
> evaluation process
>
> - JGP will give some hints regarding complement process for LGR
> ==) file "ComplementRootLGR.pptx" attached
>
> 3. AOB
>
>
> <part2>
>
> 1. action items review
>
> ==) pasted below
>
> 2. discussion between C/J/K
>
> - especially about the unacceptable variants stated by KGP
>
> 3. preparation for Beijing meeting
>
> date: 3/20 10:00-17:00 or 18:00
> 3/21 9:00-17:00 or 18:00
>
> participants: (to be confirmed)
> CGP Wangwei, Declan Ma, Jiangkan Yao, Chris Dillon(remotely)
> JGP Hiro, Yoneya, Yuri, (Maemura; TBD)
> KGP Prof.Kim, KISA, Hanja professional
>
> ==) proposed agenda pasted
> "2016 March 20-21 CJK Coordination Meeting Agenda Update.docx"
>
> Hiro
>
>
> ------------------------------------------------------------------------
> @@ action Item List [ICANN Dublin + Marrakech] as of 6/Mar/2016
> ------------------------------------------------------------------------
> D : from Dublin CJK meetings
> M : from Marrakech meetings
>
> If any progress has been made on the action item after 6 March, the
> status of the action item is shown on the line beginning with ==>
>
> D1. CGP will check and share the ratio of the labels which contain
> both traditional character and simplified character
> in .CN (and .TW) registration data to C and K.
> ==> done (Wang Wei provided the result to the mailing list)
>
> D3. Yoneya will re-write the name of the title from "Algorithm" to
> "Procedure" and add some explanation (especially regarding 'review')
> to the "Algorithm" (now "Procedure") document before Beijing
> Meeting.
>
> D4. Each of CJK GPswill share their own repertoire and variants in
> both XML and excel format. If GP doesn't have them in both
> formats, send them only in the existing format.
>
> D5. CJK will check and confirm the template of Root LGR proposal
> and ask for IP's advice if necessary
> step1: Yoneya will send the edited template to CJK mailing lists
> which includes differentiation mark <common> for CJK and
> <individual> for each GP
> step2: CJK will check the drafted template and confirm
> step3: ask for IP's advice if necessary
>
> D6. CGP will investigate and share the maximum number of labels that
> are variant of each other in .CN (and .TW) to CJK ML.
> ==> done (Wang Wei provided the result to the mailing list)
>
> D7. CGP and KGP will devise a joint statement and then KGP will
> consider whether to make a joint statement with C and J in KGP
> LGR proposal
>
> D10. Yoneya will draft a temporary schedule for each step of CJK
> integration procedure and send it to Kenny for his check. After
> that. Yoneya and Kenny will share it with CJK mailing lists to
> solicit their opinions about the schedule
>
> M1. Wang Wei will send first draft agenda of Beijing Meeting
> ==> done (Wang Wei provided a draft to the mailing list)
>
> M2. Edmon will provide to CGP/JGP/KGP an analysis document regarding
> possible scenarios for import and export of variants among 3
> GPs before Beijing Meeting. (about 8-10 slides) [Edmon]
>
> M3. Hiro will send the confirmed time schedle of Beijing Meeting
> to the whole CJK GP's.
> date: 3/20 10:00-17:00 or 18:00
> 3/21 9:00-17:00 or 18:00
> participant: (to be confirmed)
> CGP Wang Wei, Declan Ma, Jiangkan Yao, Chris (remotely)
> JGP Hiro, Yoneya, Yuri, (maemura; TBD)
> KGP Prof.Kim, KISA, Hanja professional
>
> M4. Hiro will check the environment of CJK Coordination Meeting
> planned on 10th March to Sarmad.
> + availability of Adobe connect
> + participation of IP
> + start time (9:00-10:15 or 10:30-11:45)
> ==> done (shown at the top of this mail)
>
> M5. Each of CJK GPs will consider whether each GP has other issues
> to be discussed other than coordination of variant definition
> among GPs.
> If there's some issues, share them to CJK mailing list by 9th
> March.
>
> ------------------------------------------------------------------------
More information about the ChineseGP
mailing list