Note, I also do not think that there is the need for an RFP in 2015.
I do not think that would contribute to stability or quality of performance.
> 2) That there is no need for an RFP that is periodic.
While I do believe there is a need to a periodic one.
I think the first can be 3-9 years hence.
9 seems long, 3 might be short.
6 might be in compromise range.